Civils and HV Cable Installation for Power Infrastructure

The performance of an underground power network starts well before the cable is installed. Routes must be surveyed, existing services identified and the ground prepared to protect the infrastructure throughout its working life.

PSS Power combines power civils and HV cable installation within one coordinated package, covering everything from excavation and ducting to cable pulling, substation bases and reinstatement. Our capability extends to 132kV cable installation for new connections, network upgrades and private electrical infrastructure across the UK.

Preparing the Route for
Safe, Reliable Installation

Ground conditions, access restrictions and existing utilities can all influence how a cable route is designed and delivered. Identifying these challenges early helps protect the programme and reduces the risk of disruption once work begins.

Our teams coordinate the civil and electrical elements of each project, creating a clear route from initial surve

Our Civils and Cable Installation Capabilities

The scope is shaped around the route, voltage, site conditions and wider electrical design.

Surveys and route assurance

GPR and topographical surveys, ground investigations and route assessments help identify existing services, physical constraints and the preparation required before work begins

Excavation and ducting

Trenching, duct installation, draw pits, road crossings and associated containment create a

HV cable installation

Cable pulling and coordinated jointing support for high voltage cable installation across a

Substation civils

Bases, compounds, drainage, access roads, fencing and associated power civils for

One Team Across the Civil and Electrical Works

Cable projects often involve multiple trades working within the same route and programme. Without close coordination, handovers between excavation, ducting and installation can create delays or leave issues unresolved.

By bringing power civils and HV cable installation into one coordinated scope, PSS Power can plan the people, plant, materials and safety requirements together. This reduces unnecessary interfaces and gives customers clearer oversight of progress on site.

Experience Across Demanding Sites and Routes

No two underground cable routes present exactly the same conditions. Urban locations may involve congested existing services and road crossings, while larger infrastructure projects can require long cable runs, specialist plant or work across challenging terrain.

Our experience in underground electrical cable installation allows us to adapt the delivery approach around the site while maintaining control of safety, quality and the programme. This includes the technical and logistical requirements associated with 132kV cable installation.

A Clear Route from Survey to Reinstatement

Assess the route

Review the proposed route, ground conditions, existing services, access and connection requirements.

Plan the works

Coordinate surveys, method statements, materials, resources and the HV cable installation
programme.

Prepare the infrastructure

Complete trenching, ducting, substation bases and the associated power civils.

Install the cable

Deliver the high voltage cable installation, including cable pulling and coordinated jointing support.

Reinstate and complete

Backfill and reinstate the site before completing the required documentation and preparing the installation for testing and commissioning.

Discuss your Civil and Cable Requirements

Talk to PSS Power about your proposed route, voltage, site conditions and delivery programme. We can develop a coordinated scope covering the power civils, route preparation and HV cable installation required for your project.