The performance of an underground power network starts well before the cable is installed. Routes must be surveyed, existing services identified and the ground prepared to protect the infrastructure throughout its working life.
PSS Power combines power civils and HV cable installation within one coordinated package, covering everything from excavation and ducting to cable pulling, substation bases and reinstatement. Our capability extends to 132kV cable installation for new connections, network upgrades and private electrical infrastructure across the UK.
Ground conditions, access restrictions and existing utilities can all influence how a cable route is designed and delivered. Identifying these challenges early helps protect the programme and reduces the risk of disruption once work begins.
Our teams coordinate the civil and electrical elements of each project, creating a clear route from initial surve
The scope is shaped around the route, voltage, site conditions and wider electrical design.
GPR and topographical surveys, ground investigations and route assessments help identify existing services, physical constraints and the preparation required before work begins
Trenching, duct installation, draw pits, road crossings and associated containment create a
Cable pulling and coordinated jointing support for high voltage cable installation across a
Bases, compounds, drainage, access roads, fencing and associated power civils for
Cable projects often involve multiple trades working within the same route and programme. Without close coordination, handovers between excavation, ducting and installation can create delays or leave issues unresolved.
By bringing power civils and HV cable installation into one coordinated scope, PSS Power can plan the people, plant, materials and safety requirements together. This reduces unnecessary interfaces and gives customers clearer oversight of progress on site.
No two underground cable routes present exactly the same conditions. Urban locations may involve congested existing services and road crossings, while larger infrastructure projects can require long cable runs, specialist plant or work across challenging terrain.
Our experience in underground electrical cable installation allows us to adapt the delivery approach around the site while maintaining control of safety, quality and the programme. This includes the technical and logistical requirements associated with 132kV cable installation.
Coordinate surveys, method statements, materials, resources and the HV cable installation
programme.
Complete trenching, ducting, substation bases and the associated power civils.
Deliver the high voltage cable installation, including cable pulling and coordinated jointing support.
Talk to PSS Power about your proposed route, voltage, site conditions and delivery programme. We can develop a coordinated scope covering the power civils, route preparation and HV cable installation required for your project.